National Advanced Manufacturing Centre (AMC)

JOB DESCRIPTION:

A National Advanced Manufacturing Centre (AMC) developed by IDA Ireland at National Technology Park, Plassey, Limerick.

We designed and delivered the structural glass staircase balustrades and stainless steel handrails along with some galvanised steel guardrails and stepovers at the plant area on the roof

OUR CLIENT:

Conack Construction

Exclusive Hotel Development

JOB DESCRIPTION:

A really high-end hotel in the centre of Cashel, Co. Tipperary.

We manufactured and installed all of the bespoke balustrades and handrails throughout this magnificent restoration project. Materials and finishes include antique brass, 25.52mm toughened laminated glass, grade 316 stainless steel and mild steel

OUR CLIENT:

Mulcahy Construction

EXTENSION TO RETAIL PROJECT

JOB DESCRIPTION:

A busy filling station and supermarket on the edge of Clarina, Co. Limerick.

We manufactured and erected the structural steel for the building and we also supplied and installed the Kingspan cladding

OUR CLIENT:

de Bruin Construction

Medical Equipment Manufacturing Plant

JOB DESCRIPTION:

A 17,700 m² medical device production facility at National Technology Park, Plassey, Limerick.

We detailed, manufactured, coordinated and erected all of the secondary steelwork and steel goalpost-type door frames needed to create the structures to the cleanroom production suites, laboratory spaces, administration areas, staff restaurant and welfare facilities along with very complex work such as the secondary steelwork that supports the 11m high atrium in main reception with full height oak veneered joinery panels

OUR CLIENT:

John Paul Construction

Water Treatment Plant

JOB DESCRIPTION:

A major upgrade to the existing Lee Road Water Treatment which accounts for 70% of the water supply in the city of Cork.

We detailed, manufactured, painted and erected all of the structural steelwork for the administration building

OUR CLIENT:

Murphy International

Primary School

JOB DESCRIPTION:

A new 16-classroom school with three special education teacher rooms in Kanturk, Co. Cork.

We detailed, manufactured, painted and erected all of the structural steelwork for the building

OUR CLIENT:

Vision Contracting

BOOSTER SETS

JOB DESCRIPTION:

New water pumping booster sets at various locations throughout Ireland.

We detail, manufacture, paint, clad and assemble all of the structural and secondary steelwork for these portable buildings

OUR CLIENT:

EPS Water

EXPLORE MORE